BROCKTON COSGROVE POOL
This project required the replacement of the existing pool and pool equipment with new materials and equipment. The structure of the bathhouse was maintained; however, it was completely gutted for new accessible restrooms and showers including fixtures, plumbing, ventilation, and electrical work included. Additionally, the roof was replaced and miscellaneous site improvements at the front entry for accessibility were included.