This project involved design and construction administration for the replacement of aging electrical infrastructure while maintaining full building operation. Work included the design of a new Medium Voltage (13.8kv) switchgear lineup and new 13.8kv distribution throughout the facility. It also included replacing six active substations, two of which were located on the roof with environmental enclosures.